In an impressive night-time operation, our team transported massive bridge beams for the construction of the new motorway bridge on the A3 in Luxembourg.
The dimensions were a challenge for our fleet:
- 2 x 47.5 metres long, 4.5 metres wide and weighing 130 tonnes (4+4+5 combination)
- 1 x 28 metres long, 4.5 metres wide and weighing 91 tonnes (4+5 combination)
We ensured that the disruption to traffic on one of the country's busiest motorways was kept to a minimum despite these exceptional dimensions.